Tuesday, July 27, 2010

Blog design fiddles

Well, progress has been extremely slow, turns out a full time job a, wife and a 14 month old daughter doesn't leave much free time :) Nevertheless, progress has occured:

1. Finalised 1000pt army list
2. Added progress bar to Blog showing the different units I'v egot on the go (50% = fully assembled and undercoated)
3. Fiddled with Baneblade but it's been put to one side in the interests of getting an actual army ready instead. I've also decided to go with the original tracks, the 1/35 Tiger tracks I put on just look too flimsy...
4. Airbrush practice has begun - I crunched some old stuff on ebay and bought an Iwata HP-C with the proceeds.

Plan at the moment is to assemble and undercoat the heavy support section first so that's a Medusa, Manticore and vanilla Russ. Russ is done as far as undercoat, Medusa and Manticore are in final assembly before super detailing and undercoating.

Troops and HQ next.

Watch this space :)